Solutions
Maintenance & PMS Crew & Payroll HSEQ & Compliance Procurement Provisions & Menu Finance & Budget Carbon & Voyage Technical & Drydock
Product
All Solutions How It Works Pricing
Company
About Sustainability Contact
Language / Dil
Türkçe
Log In Request Demo
Technical

Technical & Drydock

Drydock is the most expensive and complex maintenance event in a vessel's life. From the project to the dock list, from yard quotes to the budget — manage it end to end and post it to finance automatically.

app.d1maritime.com
Technical & Drydock
What is inside

What this area covers

Drydock is where the largest spend of the year happens in a single period. That's why every item is tracked separately, and across three tiers.

01

Drydock project

A periodic or emergency drydock project is opened: yard, entry and exit dates, responsible superintendent, class requirements and total budget all gathered on one card.

02

Dock list

Blasting, painting, propeller and shaft work, valves, tank cleaning, cathodic protection, class survey items... Each job is defined as a separate line and tracked individually.

03

Three-tier costing

For each work item, estimate → yard quote → actual cost are held separately. That way you see exactly where and by how much things drifted, line by line, and your next drydock estimate becomes more accurate.

04

Yard quote collection

Quotes are requested from several yards against the same dock list. Because everyone prices the same scope, the quotes are genuinely comparable.

05

Quote comparison

Price, number of dock days, quote validity and scope differences are lined up side by side. The selection is recorded together with its justification.

06

Budget tracking

Actual cost is continually compared against the budget. When the overrun threshold is crossed an alert is raised — before the project ends, while you can still intervene.

07

Automatic posting to finance

When the project closes, the total cost is written automatically to the Drydock cost centre. You don't have to enter it again; it appears immediately in the per-vessel OPEX report.

Flow

The path of a drydock project

From planning to finance: at every stage it stays visible where the cost stands.

1
Project opened
Dates, yard, budget
2
Dock list ready
With jobs from PMS
3
Yard quotes
Several yards, same scope
4
Work carried out
Actual cost entered
5
Project closed
Automatic to Finance ✓
Why it matters

No drydock surprises

Drydock puts the greatest strain on the budget. Which yard, at what price, in how many days? D1 Maritime lines the yard quotes up side by side and tracks cost across three tiers.

  • Multiple yard quotes side by side — price, days and validity.
  • Estimate / quote / actual held separately for every job.
  • Budget overruns flagged before the project ends.
  • Total cost posts to finance automatically at project close.
  • Permits during the yard period run through the same HSEQ (Health, Safety, Environment and Quality) structure.
3
Cost tiers
One
Data model
7
Role-based access
Integration

How it talks to the other families

A drydock project is not an island; it grows out of maintenance and ends in finance.

Module FAQ

Common questions

Why three-tier costing?

Because in drydock, drift happens at three points: your estimate may be wrong, the yard quote may exceed your estimate, or extra work may appear during the job. Keeping the three separate shows you which stage the drift came from, so you can correct your next drydock estimate.

How are quotes compared if the scope differs?

Quotes are requested against the same dock list, so the line items are common. Items excluded or added by a yard are flagged separately on the comparison screen; alongside total price, dock days are compared too.

Can it be used for an emergency drydock?

Yes. The project is opened with type "emergency"; the budget and date plan may be tighter, but the same dock list, quoting and cost tracking apply.

Are equipment records updated after drydock?

Work carried out in dock is written to the relevant equipment's maintenance history; renewed equipment and parts appear on their PMS cards, and the next maintenance due date is calculated accordingly.

Full platform

8 solution families

You are currently in one solution family. Here is the whole of D1 Maritime — all sharing one data model.

See Technical & Drydock live

Let us show you how this solution family works on your fleet in a tailored demo.